How road management increases productivity and lowers operating costs in the wet season

Mark Twain once famously noted:

“Everyone talks about the weather, but no one does anything about it.”

He was right about the weather – it’s a huge topic of conversation at mine sites during Australia’s notorious wet season – however there IS something you can do about it. Or at least its after effects on haul roads. It all comes down to road management and innovation…

Mining companies dread the wet season

With expensive machinery and personnel standing around idle, the downtime can quickly erode even the most successful company’s profits.

The wet season necessitates a mining company being as resourceful as possible – to call on all their powers of innovation to do things smarter and more cost effectively.

Often, there isn’t a lot you can do during adverse weather conditions; poor visibility and other safety factors can naturally bring the haulage operation to a grinding halt.

However, the recovery period is a totally different ballgame.

Traditionally what happens when the torrential rain stops, is the graders come out and grade the sloppy mess off the top of the haul roads in an attempt to dry them out and make them trafficable again.

The trouble with doing that is it leads to:

  • lost production time
  • loss of the best road surface material
  • the cost of future works (eg. pulling the material back over the road once it’s dried, clearing out drains, and replenishing lost wearing course material).

This will invariably impact on your mining company’s bottom line; all of these processes take a lot of time and cost a lot of $$$.

Download: 5 Common Haul Road Challenges eBook

Faster haul road recovery time = increased productivity

Dust-A-Side Australia has proven that stabilised roads – especially those sealed with DAS Product, a patented emulsion of bitumen in water – dry substantially faster after wet weather than unsealed roads.

The reason for this is the surface water is shed rather than pooling or being absorbed; therefore recovery is faster and you can start to ‘crank things back up again’ sooner.

However, products alone are not a magic solution.

The fundamentals of good road construction and ongoing maintenance must be incorporated. These include:

  • road camber to ensure that water is shed from the surface to the edges of the road, and
  • drainage to get the water away from the sides of the road and preventing it from soaking back into the sub layers of the pavement.

Of course all of this comes as standard under Dust-A-Side’s holistic full-service Haulroad Management System.

Waterproofing roads also helps reduce ongoing maintenance

Waterproofing roads not only leads to better productivity gains directly after wet weather, but they also reduce on-going haul road maintenance costs compared to unsealed roads…both during and after wet weather; thus lowering operating costs and helping you achieve lower cost per tonne.

This is due to the reduced washout of fines and good quality wearing course material, as well as reduced ingress of water into the sub layers of the pavement.

All of this results in less soft spots and potholing of roads – culminating in greater road maintenance cost savings.

So this wet season stop doing things the way you’ve always done it and consider an innovative approach to improving your productivity and reducing ongoing costs.

But don’t just take our word for it; read what some of our customers say:

“Dust-A-Side roads offer a huge benefit during heavy rainstorms as these roads stand up well to wet conditions allowing less production disruptions as a result of inclement weather.”

Head of Production, BHP Billiton Group

“After rain events, Dust-A-Side surfaces dry faster than untreated surfaces providing a higher level of surface friction more quickly.”

Managing Director, Road Safety Training Services

“In general the Main Haulroad is trafficable sooner after rain events. A 144mm rain event post Dust-A-Side had a 24 hour recovery versus a pre Dust-A-Side 150mm rain event for 80 hours recovery.”

Technical Services, Anglo American

“We can start up 20 – 60 minutes after the average rain event on Dust-A-Side roads with production at about 50% of capacity and 100% capacity when the non Dust-A-Side roads are graded or dried adequately. The recovery time difference between Dust-A-Side and non Dust-A-Side roads is around 1.3 to 1.8 hours as it takes longer for non Dust-A-Side roads to dry to a point where they can be graded/re-sheeted.”

Mining Manager, Anglo American

For more information and advice about utilising road management to increase productivity and reduce operating costs in the wet season, call 1800 662 387 and speak to one of our experienced engineers, or simply click here to contact us.